Blog
Practical guides for architects, property managers, and home buyers.
Arch Convert
-
Hectares and Acres Land in Arch Convert
Hectares and acres are now live in Arch Convert's Area tab. A short history of why land gets measured in weird units, and what actually shipped in v0.3.3.
-
Imperial to Metric Conversion for Everyday Use
The essential guide to converting imperial to metric measurements in architecture and construction. Common conversions, practical tips, and a free calculator.
FluxCo
-
Your property management software can't do everything. That's the point.
Off-the-shelf property software covers the common 80 percent. The specific workflows it can't reach are where the manual work piles up. Here is how we build the missing piece without ripping out what already works.
-
What we learned shipping 30 marketing PRs
Ten weeks of small marketing PRs across two FluxCo sites: copy, aesthetic polish, schema, llms.txt, AI-crawler rules. What doing all of it ourselves surfaced about the work, and the operator role we keep noticing in our own pattern.
-
See the migration before you commit to it
How FluxCo prototyped a 1,500+ record platform migration, with the client's real data, before the client committed to cutover.
-
How Long Does an AI Prototype Take?
An AI prototype takes 1 to 5 working days for a validated proof of concept. A production-ready version takes another 1 to 4 weeks. Here's what drives the timeline, what speeds it up, and a worked example from a real project.
-
Why We Started FluxCo
FluxCo started because we kept seeing the same pattern: businesses with real problems and an AI industry selling them decks instead of solutions. Here's how we do it differently.