Blog
Practical guides for architects, property managers, and home buyers.
Arch Convert
-
Hectares and Acres Land in Arch Convert
Hectares and acres are now live in Arch Convert's Area tab. A short history of why land gets measured in weird units, and what actually shipped in v0.3.3.
-
Imperial to Metric Conversion for Everyday Use
The essential guide to converting imperial to metric measurements in architecture and construction. Common conversions, practical tips, and a free calculator.
FluxCo
-
What we learned shipping 30 marketing PRs
Ten weeks of small marketing PRs across two FluxCo sites: copy, aesthetic polish, schema, llms.txt, AI-crawler rules. What doing all of it ourselves surfaced about the work, and the operator role we keep noticing in our own pattern.
-
See the migration before you commit to it
How FluxCo prototyped a 1,500+ record platform migration, with the client's real data, before the client committed to cutover.
-
How Long Does an AI Prototype Take?
An AI prototype takes 1 to 5 working days for a validated proof of concept. A production-ready version takes another 1 to 4 weeks. Here's what drives the timeline, what speeds it up, and a worked example from a real project.
-
Why We Started FluxCo
FluxCo started because we kept seeing the same pattern: businesses with real problems and an AI industry selling them decks instead of solutions. Here's how we do it differently.